Documents & Resources

Environmental Impact Report

On January 12, 2015, the City Council held a public hearing and adopted Resolution No. 15 to 05 adopting the Findings of Fact required by the California Environmental Quality Act, certifying the Environmental Impact Report (EIR) and Erratum No. 1, and adopting a Statement of Overriding Consideration and Mitigation Monitoring and Report Program.

The Final EIR, Erratum No. 1 to the Final EIR, Draft EIR, & Recirculated Draft EIR are available for review at Malibu City Hall. Contact the Planning Department at 310-456-2489, ext. 374, to request a CD. (State Clearinghouse Number 2013111075).

Building Sanitary Sewer Lateral Construction Guidelines

These guidelines establish requirements to connect with the Civic Center Wastewater Treatment Facility. A Building Sanitary Sewer Lateral (Sewer Lateral) that is properly installed and maintained will reduce the risk of sanitary sewer overflows and backup by minimizing inflow and infiltration into the sewer system. It will also minimize blockages due to pipe failure or root intrusion.


Compliance Schedule Map- Resolution No. R4-2009-007
Prohibition Boundary Map - Exhibit A of MOU
Table 4-zz - List of properties (APNs) included in Resolution No. R4-2009-007