NixleTwitterFacebook

Go To Search
Click to Home

Zumirez Drive Realignment Project
Project Overview
For years, the offset north and south segments of Zumirez Dr created functional and safety
concerns, especially when turning left from Pacific Coast Hwy (PCH) onto Zumirez Dr. The Zumirez Drive Realignment Project would alleviate those concerns by aligning the two sections of the street into a straight throughway across PCH, creating a safer intersection for motorists, bicyclists, and pedestrians

Project Details

Zumirez Drive Realignment Project The Project aligned the south segment of Zumirez Dr with the north segment at the PCH intersection. The elimination of the road offset, plus the installation of a new traffic signal, provided safer, easier access to a large residential community in the Point Dume area and several housing developments.

Construction began in March 2005, and all work was completed by September 2005.

Funding

The project was made possible in part by funding provided by Proposition C and Metropolitan Transportation Authority.

Contact Us

Elizabeth Shavelson
Assistant to the City Manager

Eshavelson@malibucity.org
310-456-2489 ext. 254

23825 Stuart Ranch Road
Malibu, CA 90265

City of Malibu